![]() |
||||||
Installation Instructions 3. Hold the gauge one inch from the tank in a vertical position. Then, center it on the tank. Beginning with the top end, indicated by F (Full), continue to press the gauge against the tank until reaching the bottom, indicated by the E (Empty). 1. Pour some very hot water (with a temperature of at least that of hot coffee to boiling), down the length of the gauge. Usually, hot tap water is not hot enough.
|
||||||
Dynavest Corporation / 2430 North American Drive/ West Seneca, NY 14224 / Tel: 716-674-3322 / Fax: 716-674-0772 |
||||||